Beer Sheva Bridge

Ordered by the municipality of Beer Sheva, the pedestrial bridge connects the university and the industrial zone. The bridge achieves its 180 meters span over the city’s train station with only three anchors. The full length of the bridge is covered with Bamboo X-treme® decking.

Project details

Convinced?

Get in touch with the MOSO® Bamboo X-treme® expert who was involved in this project.

Contact us
Rene Zaal Director of MOSO International
Go to top